Epiphany Lutheran Church

Richmond, VA September 2025 Repairs and Protective Covering, Onsite Window repairs consisted of replacing non-painted glass, stabilizing cracked glass with epoxy, reducing bulges, stabilizing structural support braces, re-cementing the exterior surface, and puttying the interior surface. Installation of protective coverings for nine windows comprised: 1) removing loose paint on the outer surface of the millwork […]
Parish of Saints Peter & Paul and Assumption

Staten Island, NY September 2025 Onsite Protective coverings were installed for four windows. The process was as follows: 1) existing protective covering removed, 2) exterior surface was re-cemented, 3) millwork was re-painted, 4) Klear-Flo™ protective covering system was installed utilizing a special perimeter frame and 1/4″ acrylic.
Assumption Church

Staten Island, NY September 20205 Window Removal and Relocation The altar window was removed and a protective covering was installed in its place. The process comprised: 1) removing the existing protective covering, 2)removing the stained glass window, 3) transporting the window to another location, 4) installing the Klear-Flo protective covering system utilizing a special perimeter […]
Summerville Church of the Epiphany

Summervile, SC September 2025 Repair & Protective Coverings, Onsite The project included work on three windows. Work comprised: 1) removing the existing protective covering, 2) re-cementing window on the exterior surface, 3) replacing non-painted cracked glass or stabilizing cracked glass, 4) re-painting millwork, 5) installing Klear-Flo protective covering system utilizing a special perimeter frame and […]
St. Patrick Catholic Church

Vale, Or September 2025 Warranty Work, Onsite Glass replacement while under warranty.
First United Methodist Church

Vineland, NJ September 2025 Cleaning, Onsite One 16 foot x 26 foot was cleaned on the interior surface.
St. Vincent de Paul Catholic Church

Wheeling, WV September 2025 Repair, Cleaning & Protective Coverings (Onsite) The project involved 22 windows. All windows were re-cemented on the exterior surface and all received Klear-flo protective covering utilizing 1/4″ glass and a special perimeter frame. Bulges were straightened on 9 windows and structural steel support braces were added as needed. Protective coverings for […]
Summerall Chapel

Charleston, SC September 2025 Repair and Restoration (Re-lead) Four multi-lancet and traceried windows were restored and re-leaded. The process consisted of: 1) removing the existing protective covering, 2) removing the stained glass windows, 3) creating and installing a transparency into the existing opening, 4) completion of the restoration process, 5) re-installing the stained glass windows, […]
Smithfield Utah Temple

Salt Lake City, UT February though August 2025 The project comprised the design and fabrication of 153 stained glass windows. There were three mobilizations in which the work was completed. Designs were ornamental with floral motifs and subtle color. The project also included tempered glass for the baptistry windows.
Saint John the Evangelist Catholic Church

Ubly, MI March 2025 Repair, Onsite Work The project involved executing repairs on 21 windows. Bulging sections were straightened. New steel structural braces were put in and loose braces were reattached. Cracked glass was stabilized with epoxy and loose stained glass was positioned back into its original lead channel where needed.