St. Jane Frances de Chantal Catholic Church

Bethesda, MD October 2025 New Stained Glass Windows The project encompassed design, fabrication, and installation of a window tryptich in the church chancel.
School Sisters of Notre Dame

Baltimore, MD October 2025 Window Removal, Modification and Reinstallation into a Light-Box, Onsite The project encompassed removing a portion of an existing window, transporting it to another location, and installing the removed sections into a light-box. This was done for two existing windows. The process comprised: 1. removing 6 sections of the window above the […]
St. Richard’s Catholic Church

Barnesville, PA October 2025 Repair, On-site Repairs were completed on 26 windows and consisted of the following: 1. re-cement the exterior surface, and 2. remove existing glazing and perimeter of window panels sealed on the exterior with Silpruf®. Other repairs comprised: 1. reducing bulges (three windows), 2. replacing non-painted, cracked, missing, or mismatched glass (four […]
First Presbyterian Church

Croswell, MI October 2025 Repair and Protective Coverings, On-site Repairs comprised: reducing bugles (one window), stabilizing cracked glass (six windows), replacing non-painted broken glass (two windows), installing new steel structural support braces (one window), bending glazing bars to follow the major lines of the framing, thus preserving the exterior appearance of the architecture (one window), […]
First Presbyterian Church

Fairmont, WV October 2025 Warranty Repair work was performed for leaded windows under warranty.
St. Mark Lutheran Church

Fremont, OH October 2025 Repair and Protective Coverings, Onsite Protective coverings were installed for twenty-seven windows utilizing this process: 1. removed existing protective covering, 2. re-cemented windows on the exterior surface, 3. re-painted millwork, and 4. installed Klear-Flo™ protective covering system utilizing a special perimeter frame and 1/4″ acrylic. Repairs comprised: 1. stabilizing cracked glass […]
Trinity Episcopal Church

Galveston, TX October 2025 Repair and Protective Coverings, Onsite Protective coverings were installed on sixteen windows. The process comprised the following steps: 1. exterior surface of window frames re-painted with rust-inhibiting paint, 2. Klear-Flo™ protective covering system installed utilizing a special perimeter frame and 3/8″ laminated glass, 3. glazing bars added where necessary to follow […]
Georgetown Presbyterian Church

Georgetown, DE October 2025 Repair and Protective Coverings, Onsite Protective coverings were installed for thirty-four windows. The process consisted of: 1. removing the existing protective coverings or screens, 2. re-painting the millwork, 3. installing the Klear-Flo™ protective covering system utilizing a special perimeter frame and 1/4″ acrylic. Repairs comprised replacing or repairing window sills (two […]
Etz Chayim Congregation

Huntsville, AL October 2025 Protective Coverings, Onsite Protective coverings were installed on seventeen windows in the sanctuary and other areas of the building. The type of window installed was a 1.25 inch bullet-resistant material with Azek perimeter moulding. On three windows millwork was re-painted, protective covering was installed in traceries, and the bullet-resistant covering was […]
St. Francis Borgia Catholic Church

Pigeon, MI October 2025 Repair and Protective Coverings, Onsite Thirty-three windows received protective coverings. The process comprised: 1. removing existing protective coverings, 2. re-cementing the window on the exterior surface, 3. re-painting millwork, 4. installing the Klear-Flo™M protective covering system utilizing a special perimeter frame and 1/4″ acrylic. Repairs included: 1. reducing minor bulged sections […]